Planned roadworks in West Sussex – 19 September 2018 to 3 October 2018

25 September 2018

Please note: this news article is in our archive. Articles were correct at time of publication, but should not be relied on for accuracy after the passage of time.

These are the planned roadworks and do not refer to road closures for events or emergency works.

Holtye Road East Grinstead Carriageway pothole repairs. Two-Way Signals. 24-Sep-2018 24-Sep-2018 West Sussex Highways
Imberhorne Lane East Grinstead Burst water main in carriageway. Two-Way Signals. 14-Sep-2018 21-Sep-2018 South East Water
London Road East Grinstead Repair single service electricity cable affecting customers supply. Two-Way Signals. 18-Sep-2018 24-Sep-2018 UK Power Networks South Eastern
Moat Road East Grinstead Access Openreach chamber to cable duct. Multi-Way Signals. 02-Oct-2018 02-Oct-2018 Openreach
St Johns Road East Grinstead Accessing BT chamber to cable duct. Multi-Way Signals. 02-Oct-2018 02-Oct-2018 Openreach
West Hill East Grinstead New connection to water main. Two-Way Signals. 24-Sep-2018 28-Sep-2018 South East Water
West Hoathly Road East Grinstead Carriageway pothole repairs. Two-Way Signals. 01-Oct-2018 01-Oct-2018 West Sussex Highways

Please note that carriageway works being undertaken by West Sussex Highways are subject to last minute date changes due to weather conditions, equipment breakdown or emergency work taking priority.  The works may start at any time up to 5 days from the planned start date given above.  On street yellow ‘Advanced Warning’ boards will provide details of latest dates.

An alternative map-based report showing roadworks for the following month is available here. Be aware that the report may not be available until after 5pm on a Wednesday. In the event that this week’s report is not currently available, the link will display last week’s report. Information for individual parishes can be viewed by selecting the required parish name from the dropdown list available by clicking on the menu button. Note: the map-based report requires the use of an up-to-date browser.