We are pleased to inform you that as part of our continuing efforts to improve the highways, work is due to commence soon at London Road, East Grinstead.
What we’re doing
This project will include:
- Refurbishment of the existing Pelican crossing to a new style Puffin pedestrian crossing. All new equipment will be installed on site.
- Inclusion of pedestrian beepers and rotating tactile devices to aid those with visual impairments to cross safely.
- Alteration of dropped kerbing to improve drainage. With the pedestrian tactile paving being replaced.
- A temporary pedestrian crossing facility is currently on site and will remain on site for the duration of the refurbishment.
When this will take place
The work will start on 22 May 2017 and is expected to take 2 weeks to complete. Our hours of work will generally be between 9am and 5pm.
Road Restrictions during the work
A temporary narrowing of the carriageway will be introduced to ensure the safety of those working on site. With a temporary pedestrian crossing facility in place.
Information for residents
We know our works can cause disruption but will do our utmost to minimise any impact.
We apologise for any inconvenience caused.
Please don’t park where you may cause an obstruction. At times access may be limited. We will always do our best to allow access to homes and businesses. Some work is weather dependant. We will keep you updated with any delays & changes via the advanced warning signs.
If you have special needs or requirements please get in touch or speak to our staff on site.
Frequently Asked Questions
1. Why does this work have to take place?
The refurbishment was initiated as a result of the annual inspection. During the inspection the engineer identified a critical safety issue with one of the poles on site. Due to this reason the site was decommissioned, with a temporary pedestrian crossing installed on site.
2. What work has to be done?
The existing pedestrian crossing will be replaced by a new style Puffin crossing. This will involve a temporary narrowing of the carriageway and a temporary pedestrian crossing facility will be in place.
3. What will the benefits be once it is finished?
A puffin crossing with be installed utilising the latest technology. Above ground detectors will be installed to improve pedestrian safety, LED lamps to improve visibility for motorist and improved kerbing and tactile paving to improve drainage.
4. Will any road have to be closed during the works?
No.
5. When will the work start?
The works are due to begin w/c 22 May 2017.
6. When will the work finish?
It is expected to be completed by 5 June 2017 but this can be dependent on weather conditions and other external factors.
7. Can works be carried out at evenings or overnight?
No this scheme will operate during normal working hours.
8. How much will it cost?
The estimated cost for this scheme is £30,000
9. What disruption can motorists or bus passengers expect?
Motorists may be subject to additional delays due to traffic management.
10. Are there any other considerations people need to be aware of?
Pedestrians maybe diverted off the footpath, however safe walkways will be provided. Temporary pedestrian crossing will also be in use.